İpucu modu açıktır Kapat
Bölümler arasında hızlı gezinim için

Kuruluş: Zeyskaya GES
VKN 2805002685, Birincil Devlet Sicil Numarası 1022800926829

Tasfiye halindeki kuruluş
Halef şirket: RUSGIDRO
Kuruluş adı
Zeya Hydroelectric Power Station
Ülke adı
Rusya
Kayıt ülkesi
Rusya
Endüstri
Elektrik enerjisi endüstrisi
Tahvil borcu
-

en kapsamlı veri tabanını keşfedin

800 000

dünya çapinda tahvi̇ller

400'den fazla

fiyatlandırma kaynakları

80 000

hisse senetleri

9 000

ETF

Portföyünüzü en etkili şekilde takip edin
tahvi̇l arama
Watchlist
Excel Eklentisi

Şu tarihe ilişkin son veriler

Kotasyonlar

Talep gönderildi
Erişim reddedildi
Bilgi sağlayıcılarının sunduğu kotasyonlar, gösterge niteliğindedir

Profil

The Zeya Hydroelectric Power Station is the first large-scale station in Pacific Russia built in the area of a severe continental climate with the annual temperature range difference up to 80 degrees C. The Zeya Hydroelectric Power Station is unique. There were installed for the first time in the world powerful adjustable-blade diagonal-flow turbines. They were designed in such a way that the blades are not horizontal but installed at 45 degrees to the axis. It allows to start the turbines even at low levels of water at the water storage basin.The dam itself is unique in design: it was formed not of monolithic concrete but of hollow concrete buttresses. There were used much less construction materials as compared with a monolithic concrete design. For the first time in the world there was used at the Zeya Hydroelectric Power Station's dam a cavitation-durable concrete with coarse-gravel filling.A volume of concrete required for the start-up of the Zeya Hydroelectric Power Station came to a half of the designed and the amount of investment - to less than 60% of the Project construction total costs. These figures are very low for the Russian hydropower construction engineering.The Zeya Hydroelectric Power Station is a complex hydropower system. Its importance is manifested not only in kWhr figures; it regulates the level of the Zeya River which prevents flooding of the lower Zeya and Amur rivers.Old inhabitants of Zeya and Blagoveshchensk cities as well as riverside villages remember those losses and damages caused by flooding. During downpour seasons at the north the Zeya River having burst into freedom used to flood hundreds of hectares of fertile lands, meadows, crops and threatened even large cities. The Zeya Hydroelectric Power Station's dam has tamed the rowdy nature of the Zeya River for good.

Ödüller

Dokümantasyon

Hisse Senetleri

Para birimine göre tahvil borcu

Kodlar

  • VKN
    2805002685
  • IEC
    281501001
  • Birincil Devlet Sicil Numarası
    1022800926829 on 03.10.2002
  • OKPO
    4623672

Kredi ve ESG derecelendirmeleri

Üç aylık raporlar/RMS raporlaması

2007
2006
Giriş yapmalısınız
Bir başvuru formu gönderin erişimler

Makroekonomik Göstergeler - Zeyskaya GES

Kayıt gereklidir erişim için